Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 8689

Re: ECC issues while upgrading PI 7.1-> 7.4 (Dual Stack)

$
0
0

>>>>what steps can be taken care in SAP ECC side , for the proxy to point to two PI integration servers at the same time , PI 7.1. Production and PI 7.4 (newly developed=)


Are you trying to connect ECC production system to PI production and PI development system in parallel? Why do you want to connect a production instance and development instance?

 

Azhar has already provided pointers and you can find lot of documents on SCN about IDOC_AAE/ Proxy using SOAP.


Viewing all articles
Browse latest Browse all 8689

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>